Shipper lists  /  Aggregates

Shipper list · Updated Aug 25, 2026

Who ships aggregates, and when do they book?

The US produces about 2.8 billion tons of aggregates a year: 1.5 billion tons of crushed stone worth over $24 billion plus 920 million tons of sand and gravel. It is the heaviest, shortest-haul freight on this calendar, and it runs on a construction season from March to November.

Season

Commodity playbook

Who ships aggregates

ShipperTownCounty
Vulcan MaterialsBirmingham, ALJefferson
Martin MariettaRaleigh, NCWake
Summit MaterialsDenver, CODenver
Heidelberg Materials North AmericaIrving, TXDallas
Get the full list with contacts in your inbox → breadd.ai

Head offices of four large producers. Each operates hundreds of quarries and pits, and the quarry dispatcher is the person who actually hires trucks.

Ask for the dispatcher at the quarry, not the corporate office. Aggregate hauling is arranged site by site and often day by day, against a jobsite schedule that changes with the weather. Many producers run their own trucks for the base load and bring in outside capacity for peaks, which is precisely the gap worth filling.

Where it hauls

Everywhere there is rock, which is nearly everywhere. Aggregate is so heavy relative to its value that hauling it far destroys the economics, so quarries and pits sit close to the metros they serve and the typical haul is measured in tens of miles. That means the freight is dense, local and repetitive rather than long and lane-shaped. The largest producers run hundreds of sites each. The companies to know:

How to open

"Do you need end dump capacity when the season opens? I'd rather be on your list in February than turn up in June."

To the quarry dispatchers, February into March

The question that shows you know the business is about the jobsite: "How much notice do you get when a pour moves?" Aggregate demand swings with a schedule nobody controls, and flexible capacity is what they are actually buying.

Qualifying questions

  • End dump, belly dump or live floor? The receiving site decides. Belly dumps windrow material along a road; end dumps need overhead clearance and firm ground to raise safely. Confirm what the site takes before you send anything.
  • What is the material and the target weight? Crushed stone, washed sand, base rock and rip rap all load differently and weigh differently. Aggregate loads run to legal weight every time, so the scale ticket is the whole transaction.
  • Is the site firm enough to dump? Raising a loaded end dump on soft or uneven ground rolls trucks. It is the single biggest safety issue in this freight. Ask about ground conditions and whether a spotter is provided.
  • What are the quarry and jobsite hours? Both ends run tight hours and the jobsite may close when the crew leaves. Get the scale house hours and the site cutoff, because a load that arrives late has nowhere to go.
  • How much notice do you get when a pour moves? Jobsite schedules move with weather and inspections. This question tells you how much flexibility they need from a carrier, which is the actual product you are selling here.

When to call

February and March, before the construction season opens. From March to November the pits run hard and capacity is spoken for. Winter is genuinely slow in the north and that is when arrangements get made. In the Sun Belt the season is longer and the conversation is less seasonal.

Sources

  • National Stone, Sand and Gravel Association: approximately 2.8 billion tons of aggregates produced annually in the United States, with 1.5 billion tons of crushed stone valued at more than $24 billion and 920 million tons of construction sand and gravel valued at $11 billion in 2023. NSSGA represents 90% of crushed stone and 70% of sand and gravel produced annually, across an industry employing more than 100,000 people. nssga.org
  • The February to March call window and the typical haul distance. Reasoned from the construction season and the weight-to-value economics rather than a published figure.

Edition history

2026-08-25Calendar entry. The evergreen half: why the haul is short, who actually dispatches, and the season that opens in March.